Steps

Posted on Thursday, June 13th, 2019 at 10:23 am

10 am: Step 1 complete. LZB block cleaned, glued, and clamped. I’ll give it 4 hours to set before drilling for screws. Once, the screws are set, I can remove the clamp and drill for dowel. The chair will need a couple of days for the glue fumes to subside enough for AC. So timing is fairly forgiving.


Ham, chicken, and brisket are the current fridge fare. Chicken will join broccoli, cauliflower, and rice. Ham will join spuds and a ham, egg, and cheddar sandwich. Brisket will be sandwich fodder, as usual. Steamed veggies. Easy to fix, good summer menu.


Watching Curse of the Undead, a western vampire movie from the 50s. More B&W drive-in scream fodder.


More later…

….
….


2pm: Steps 2 and 3 complete. Holes drilled and screws set (8). Holes drilled and dowels in place (2). Tools put up. All that is required is a little curing time.

And feeding Myka.

Both comments and pings are currently closed.

Comments are closed.